단위변화시 오류(동명97-217)
2006-03-31
PROJECT 단면B-B
SOIL 1 충적토(실트ML)
0.380 1.70 0.80 4.0 0.0 900
2 충적토(실트ML)
1.280 1.70 0.80 4.0 0.0 900
3 매립토(모래SM)
2.680 1.80 0.90 0.0 25.0 1200
4 풍화암(WR)
4.180 2.00 1.10 5.0 33.0 15000
5 연 암
6.380 2.30 1.40 15.0 34.0 284000
VWALL 1 4.000 0.01047 0.0001150 21000000. 2.000 0.765
ANCHOR 1 1.200 0.00039484 30 4.0 2.000
DIVISION 0.2
OUTPUT 1
STEP 1 EXCAVATION TO 1.700
OUTPUT 0 0 0 0
ITERATION 20 0.1
RANKINE 1.0 0 33.33
SLOPE 41
SURCHARGE 1.0
EXCAVATION 1.700
GWL 0.880
STEP 2 CONSTRUCTION ANCHOR 1 AND EXCAVATION TO 3.000
CONSTRUCTION ANCHOR 1
EXCAVATION 3.000
GWL 2.000
GROUND SETTLEMENT
INSERTION CHECK
STEP 3 PECK CHECK
PECK 0.65 0.00 0.263
GWL 3.000
END
----------------------------------------------------------------
PROJECT (단면B-B)
UNIT SI
SOIL 1 충적토(실트ML)
0.380 17.00 8.00 40.0 0.0 9000
2 충적토(실트ML)
1.280 17.00 8.00 40.0 0.0 9000
3 매립토(모래SM)
2.680 18.00 9.00 0.0 25.0 12000
4 풍화암(WR)
4.180 20.00 11.00 50.0 33.0 150000
5 연 암
6.380 23.00 14.00 150.0 34.0 2840000
VWALL 1 4.000 0.01047 0.0001150 210000000. 2.000 0.765
ANCHOR 1 1.200 0.00039484 30 4.0 2.000
DIVISION 0.2
OUTPUT 1
STEP 1 EXCAVATION TO 1.700
OUTPUT 0 0 0 0
ITERATION 20 0.1
RANKINE 1.0 0 33.33
SLOPE 41
SURCHARGE 1.0
EXCAVATION 1.700
GWL 0.880
STEP 2 CONSTRUCTION ANCHOR 1 AND EXCAVATION TO 3.000
CONSTRUCTION ANCHOR 1
EXCAVATION 3.000
GWL 2.000
GROUND SETTLEMENT
INSERTION CHECK
STEP 3 PECK CHECK
PECK 0.65 0.00 0.263
GWL 3.000
END
SI단위계로 INPUT DATA를 넣었더니 "RANGE OF PARAMETER IN SOIL DATA"메세지가 뜹니다.
바쁘시겠지만 검토해주시고 가급적 빠른시간안에 답변해주시면 감사하겠습니다..