침하량 관련 질문입니다. 99-N-16 2006-03-31

Project : 터널 주변부 구간(앵커 7단)- TB-24 Time : 09:27:03
--------------------------------------------------------------------------------
Step No. 9 << EXCAVATION TO 18.8M AND ANCHOR 7 >>

Ground Settlement by Caspe(1966) method
(see FOUNDATION ANALYSIS AND DESIGN 4th ed. p659)

Excavation Depth (HW) = 18.80 m
Average Phi to ex. depth = 27.56 Deg
Width of Excavation (B) = 44.00 m
Hp = (0.5 B tan(45+PHI/2) = 36.30 m
Ht = (Hw+Hp) = 55.10 m
Distance of Influnce D=Ht*tan(45-PHI/2)) = 33.39 m

Volume of deflection (Vs) = 0.20059 m3
Settlement at wall Sw = 4 Vs/D = 0.02403 m = -24.03 mm

Distance 0.0*D 0.1*D 0.2*D 0.3*D 0.5*D 1.0*D
( m ) 0.0 3.3 6.7 10.0 16.7 33.4

Settlement(mm) -24.03 -19.46 -15.38 -11.77 -6.01 0.00

Note. The results shown are approximation recommended by Caspe.

-------------------------------------------------------------------------

위 해석 내용에 대한 자세한 해설을 부탁드립니다. Excavation Depth (HW) 부

터 Settlement(mm)까지 자세한 해석 부탁드립니다. 제가 위 해석 값에 대해서

제가 해석하는데 어려움이 많아서 부탁드립니다.

제 메일로 보내주시거나 게시판에 올려 주시면 감사하겠습니다.