insertion check (한구엔지니어링 2000-357)
2006-03-31
수고하십니다...
insertion check가 되지않아서 검토부탁합니다.
PROJECT 가시설단면 E-E
SOIL 1 매립토
4.30 1.8 1.1 0.0 35 2750
2 토 사
8.70 1.8 0.9 0.0 29 3000
3 풍화암
25.0 2.0 1.1 1.5 35 4500
VWALL 1 4.214 0.01198 0.000204 21000000 2.0 0.9 0.3
SLAB 1 0.944 0.54 2.7
WALL 1 0.200 1.214 0.35
DIVISION 0.5
STEP 1 EXCAVATION TO 1.214
MINIMUM-ACTIVE 0.5
SURCHARGE 1.0
RANKINE 1.0
ITERATION 10 0.1
EXCAVATION 1.214
STEP 2 INSERTION CHECK
GROUND SETTLEMENT
STEP 3 PECK CHECK
PECK 0.65 0 0
STEP 4 CONSTRUCTION SLAB 1
CONST SLAB 1
STEP 5 CONSTRUCTION WALL 1
CONST WALL 1
END